Engineering Vision for Construction Development L.L.C — Manpower Invoice Summary
Invoices — daily rates & working days
Engineering Vision for Construction Development L.L.C — Manpower invoice (USD)
This project Selected in list — rate × days
All projects USD totals from loaded timesheets · change project or refresh to load each site
1) Daily rates (USD)
| # | Position | Daily rate (USD) |
|---|
2) Working days per position (from timesheet)
| # | Position | Total days |
|---|
By default, days follow the TimeSheet DaysOn logic (timesheet_shared.js). Use Edit days in the toolbar to override totals per position (stored in this browser). Positions come from the employee list for this site; contract rows use invoice_rates.js and invoice_role_aliases.js. Numbers reflect the saved timesheet on the server; after you save in TimeSheet they update here immediately (same browser), and the page also re-syncs about every 25 seconds while this tab is visible and when you return to the tab.
أرقام الأيام من التايم شيت المحفوظ؛ يجب الضغط على Save في TimeSheet ليُكتب الحضور في الخادم. بعد الحفظ تُحدَّث الفاتورة مباشرة (نفس المتصفح)، وتُعاد المزامنة تلقائياً كل نحو 25 ثانية وعند إظهار هذا التبويب مجدداً.
3) Daily rate × days
| # | Position | Rate/day | Days | Total (USD) |
|---|---|---|---|---|
| Grand total | 0.00 | |||